4 ft Metal Concrete Form Panels For Walls & Columns - HDO Plywood
Equivalent To Symons Steel-Ply and Sure Built Sureply Modular Forms
Our 4 ft metal concrete wall forms panels are equivalent to Symons Steel-Ply and Sure Built Sureply Forms, created for a more efficient concrete forming process, resulting in time and cost savings. The lightweight panels (approximately 5 lbs per sq ft) can be hand-set up by a single individual. With set tie locations, this modular forming system requires no drilling or measuring on-site, while the fast hardware connections enable quick assembly and efficient pours.
The combination of high-carbon steel frame and HDO plywood faces produce a 1,000 psf rated system with a reliable safety factor, as well as the ability to withstand moisture, wear, and chemicals. This results in consistent performance and reduces the need for costly replacements and project delays. Get our reusable metal concrete forms for sale today! [More sizes available: 8 ft concrete form panels]

Sizes Made To Order (*24" x 4 ft Currently Stocked): For all sizes other than 24" x 4 ft, once your order is placed, we will custom make your order. Scroll down or click here to view size, delivery, pricing breakdown
- Free Shipping
- 1-3 Week Delivery ETA: 24" x 4 ft size
-
6-8 Week Delivery ETA: All other sizes
Sandbaggy carries a variety of concrete forming supplies.
Specs
- Frame Material (filler): Steel
- Panel Material: HDO Plywood
- PSF Rating: 1,000
- Steel Frame Strength: 55,000 PSI
- Total Height: 4 ft
- Color: Red
Features
- Equivalent To Symons Steel-Ply and Sure Built Sureply Forms: Compatible with all the same concrete forming accessories. This is a pre-engineered, reusable, factory-built concrete forming system made from steel frames with inset plywood faces. Also called concrete forms
- Commercial Or Residential Structures: Great for almost any concrete structure, whether horizontal or vertical. Perfect for a variety of concrete walls and columns.
- 1,000 psf Rated System with Predictable Safety: A complete, engineered system with a 1,000 psf load rating, ensuring predictable safety throughout the form's lifespan.
- Durable, High-Quality HDO Plywood: Consistent performance across multiple pours. HDO plywood has a smooth, durable finish that is resistant to moisture, wear, and chemicals.
- Strong, Stable Steel Frame: Constructed from a high-carbon, 55,000 PSI structural steel frame. The sturdy frame of these steel concrete forms guarantees long lasting strength, serving as a dependable base for all your concrete pouring needs.
- Forms Can Be Handset or Gangformed: Easily connect these 4 foot concrete wall forms together with Wedge Bolts. Lightweight enough to be hand-set by a single person (panels are approximately 5lbs per square foot).
- Reusable: can be used multiple times before being re-plyed..
To ensure optimal performance and longevity of your forms, always apply a generous amount of form oil before setting the forms in place. Skipping this crucial step can significantly reduce the durability and effectiveness of the forms over time.
Proper application of form oil not only helps in easy form removal, but also prevents material buildup and extends the life of your equipment. For best results, coat all contact surfaces thoroughly before each use.
Size, Delivery, & Pricing Breakdown
Size | Delivery ETA | Availability | Starting Price (per each) |
Lowest Price (per each) |
---|---|---|---|---|
24" x 4 ft | 1-3 weeks | All qty variants | $211 | $133 |
22" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
20" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
18" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
16" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
14" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
12" x 4 ft | 6-8 weeks | 20 min. order qty | $174 | $133 |
10" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
8" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
6" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
5" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
4" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
3" x 4 ft | 6-8 weeks | 20 min. order qty | $139 | $106 |
Instructions For Using Sandbaggy's Symon-Style Form Panels
Here’s a step-by-step instruction list for how to use Sandbaggy Metal Concrete Form Panels for building walls and columns:
Tools & Materials Needed
- Sandbaggy metal form panels
- Stakes or form pins
- Walers (wood or metal horizontal supports)
- Form ties (snap ties or taper ties)
- Hammer or impact drill
- Level
- Concrete vibrator (optional)
- Release agent (oil or form spray)
Installation Instructions
-
Prepare the Base
- Excavate and level the ground where the wall or column will be poured.
- Ensure subgrade is compacted and flat.
- For walls: Set up a footing if required and let it cure before installing forms.
- Apply Form Release Agent: Spray or brush form release oil on the interior surface of the panels to prevent concrete from sticking.
-
Place Bottom Panels
- Position the first row of Sandbaggy panels at the base. Secure them using form stakes or pins.
- Use a level to ensure they are straight and aligned.
-
Install Vertical Rebar (if required)
- Insert and tie vertical rebar inside the form based on your structural requirements
- before the second row of panels.
-
Stack Additional Panels
- Stack panels vertically using their interlocking edge or connection brackets.
- Secure with panel clamps or bolts as required to prevent shifting.
-
Tie Forms Together
- Insert form ties (snap ties or taper ties) through the holes in the panels. These will hold both sides together during the concrete pour.
- Place ties every 18–24 inches vertically and 2–4 ft horizontally, depending on pour height.
-
Add Walers & Bracing
- Attach horizontal walers across the exterior to further stabilize the panels.
- Use diagonal bracing to prevent movement during concrete pour.
- Final Alignment: Double-check plumb and alignment before pouring. Adjust using braces.
-
Pour Concrete
- Slowly pour concrete into the form.
- Use a vibrator or tapping to remove air pockets.
- Do not overfill—maintain a steady pour level.
-
Let Concrete Cure
- Allow concrete to cure per spec (typically 24–48 hours minimum).
- Keep it covered or moist to prevent cracking if in hot weather.
-
Strip the Forms
- Carefully remove ties and pull off panels once concrete is hardened.
- Clean panels immediately for reuse.
Our Customers
Our sandbags, burlap bags, and landscape staples are trusted by